| The Easiest to
Install |
| As this series
of illustrations show, installation clearly is a snap! Each
piece with it's proprietary nesting feature can be
positioned only one way. |
|
Step 1 |
Build a sound,
noncombustible foundation. |
|
Step 2 |
Set the base plate square
and level, along with the first firebox side. |
|
Step 3 |
Set back right corner and
place center backs along rear base plate. |
|
Step 4 |
Set the back left corner. |
|
Step 5 |
Set the remaining firebox
sides. |
|
Step 6 |
Line the firebox with
firebrick. |
|
Step 7 |
Place FIRE ROCK high draft
throat across top of firebox sides. |
|
Step 8 |
Set smoke chamber
components. |
|
Step 9 |
Set top plate to finish off
firebox and smoke chamber. |
| |
| Build chimney as
plans call for, either with metal flue or FIRE ROCK solid
block chimney. |
| |
|
Installation & Specification
Manual (pdf format) |